Case Studies
AmmLee Group have successfully completed a number of projects in countries including South Africa, Botswana, Swaziland, England, Scotland, Northern Ireland and the Republic of Ireland.
North East Highlands of Scotland
AmmLee Group was tasked with underwater HydroDemolition to remove concrete from a dry dock wall seal in the North East Highlands of Scotland.
Roadbridge Windfarm Project
AmmLee Group was tasked by Roadbridge to remove defective concrete from the base of a wind turbine using hydrodemolition.
Island of Ireland Bridge Project
AmmLee Group was tasked to remove concrete from a bridge on the Island of Ireland using hydrodemolition.
Asphalt Drum Project
AmmLee Group was tasked with hydroblasting an asphalt drum using 1000 bar at 231 litres per minute.
Staffordshire Project
AmmLee Group was tasked with removing 3 cubic meters of concrete using 30,000 litres of water.
Reading Project
AmmLee Group with were tasked with removing 9m³ of concrete spans on a foot bridge.
Epsom Surrey Project
AmmLee Group with were tasked with removing 9m³ of concrete from a column/intersecting beam.
Teesport Project
A client in Teesport needed to inspect the rebar in two openings. However, the openings were filled with concrete, and the client needed a solution to remove the concrete without causing any damage to the underlying structures.